SURAT PERINTAH KERJA (SPK PRODUKSI)
IN PROGRESSNo PO: PROD-2026-001 | Project: Booth PT ABC – 6x6 Meter | Client: PT ABC INDONESIA
Kepala Produksi (PIC):
Andi Wijaya
Target Deadline Workshop:
12 Sept 2026
Venue Pelaksanaan:
JCC Senayan Hall A
Overall Progress:
52%
Total Akumulasi Progres Produksi
52% Selesai
KONTROL PROGRESS 8 TAHAPAN PRODUKSI WORKSHOP
Geser slider atau checklist untuk mengupdate progres per divisi workshop.
DESIGN
Bobot: 10%
100%
SELESAI
MATERIAL
Bobot: 15%
100%
SELESAI
CUTTING
Bobot: 15%
75%
PROSES
ASSEMBLY
Bobot: 20%
50%
PROSES
HPL
Bobot: 15%
30%
PROSES
PAINTING
Bobot: 10%
0%
PENDING
ELECTRICAL
Bobot: 10%
0%
PENDING
QC
Bobot: 5%
0%
PENDING